Free Demo: Discover How Just 2 People Can Easily Deploy A 100m (300 ft) Flood Barrier in 60 Minutes or Less.

Easy NoFloods barrier deployment

Free Demo: Discover How Just 2 People Can Easily Deploy A 100m (300 ft) Flood Barrier in 60 Minutes or Less.

Unlike traditional flood prevention techniques that consume a lot of labour and resources (e.g. sandbags), we’ve engineered a proven, smarter and more effective system that uses the threat (water) to fight the threat (water).

Using flood water as a resource to fight the flood, you can build up a flood barrier that uses less than 1% of the help you would typically use if you did the same amount of work with sandbags.

No heavy lifting is involved, hence no stress or pain on your back.

You only use a simple technique and let the water pumps do the rest of the work.

It’s probably the world’s best flood defence system!

Easy Deployment Of The Nofloods Twin-tube (Semi-Pro) Barriers

The video below shows how a small team of 1-2 people can quickly deploy 100 meters of our NoFloods Semi-Pro 60 in just 60 minutes.

The barrier was deployed at the shoreline, and you will get to see a step-by-step visualization of the entire deployment process.

Want To Learn More About Our Barriers? Then Click/Tap Here To Get In Touch

We focus on the deployment of the flood barrier. However, the barrier was deployed for weeks until the water level in the lake resided.

It eliminated further erosion by partly damming up the water.

General information about the NoFloods Barriers

  • Tubes are delivered as twin or triple tube configuration
  • The two interconnected tubes make the barrier stable for flood control
  • To avoid seepage, the width of the barrier should be approximately 3 times the height.
  • Seepage can be reduced by adding a protective membrane in front of the flood barrier
  • The flood barrier can be delivered in any section from 5-200 m / 15-600 ft. It can be extended with additional tubes.
  • Filling of water will typically take place from terminals and junctions. In this case, we filled directly into the tubes.
  • A hydraulic winch is recommended during removal of the tubes. Smaller systems or shorter lengths can be removed by hand.
  • Additional tubes can be connected. E.g. 3 tubes horizontal or vertical (triangle).

Want To Learn More About Our Barriers? Then Click/Tap Here To Get In Touch

Who Can Use the NoFloods Barriers?

  • Emergency Agencies
  • Companies & factories
  • Water Boards
  • Local Authorities
  • Damage Control Companies
  • Hospitals
  • Homeland Security
  • Army Corps of Engineers
  • Construction and Utility Companies
  • Etc. 

Locations Where The Barrier Has Been Successfully Deployed

Sweden, Norway, Italy, USA, France, Germany, Spain, Thailand, Australia, Serbia, Romania, Hungary, Denmark, Holland and other countries.

Applications of the Water-Filled Flood Control Barriers

  • Flood protection of houses
  • Flood protection of companies
  • Critical infrastructure
  • Water companies
  • Utility companies
  • Environment companies
  • Construction work in wetlands
  • River diversion
  • Culverting
  • Cable and Pipeline works
  • Land reclamation
  • Transportation of water
  • Transportation of liquids
  • Temporary storage of liquids.

Want To Learn More About Our Barriers? Then Click/Tap Here To Get In Touch

Share this post


This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.